Power quality specialists since 1991

Case Studies

What do our customers say?

Our site losses were in the tens of millions of dollars per quarter….. installation of 805 locations (service entrance, distribution panels, branch panels and MCCs). I am please to report our sizeable investment in TPS mitigation has more than paid for itself many times over, and is still fully functional now, ten years later. Our site projects the Return on Investment was less than two months. This meant that the millions of dollars that we saved in losses, was turned into increased profitability and we even gained profit margins.”
ATMEL
Power Quality Engineer
“During the first 18-months of operation, our CEP experienced a high failure rate of motors, starters, drives, contactors and controls totaling over $200,000. Unfortunately, our construction superintendent had ignored our sole source specification of TPS for all surge protection installations. We called in the experts at TPS and they applied their filtering technology to our MCCs, Distribution Panels, Lighting Panels and Controls, replacing the switchgear manufacturer’s surge protection offerings. I am please to report that the total electrical maintenance costs for the CEP during the same 5-year period (immediately following the installation of TPS technology) is less than $7,000. This represents a 96% savings to our electrical maintenance costs.”
Advent Health
Director of Facilities
...it was evident that there was an abundance of voltage anomalies on the system... I am pleased to report that since the installation in 2009 to 2011 we have had no issues related to our power quality in this area.
Toyota
Specialist Manufacturing Engineer
That was in 2015. Since we installed the protection equipment, we’ve had zero equipment failures due to power surges – with one notable exception. The power company’s transformer, located on our property, exploded one weekend. The power company called me explaining that this event would have caused massive damage to our equipment and advised me to come in to assess the situation. To everyone’s astonishment, only one electronic device was affected at a relatively minor cost. And we had zero downtime.
Western Industrial Tooling
CEO at Western Industrial Tooling